title
Resolution further amending Resolution 42 effective January 10, 2019, as amended by Resolution 665 effective October 11, 2019, to revise and increase the City of Pittsburgh's portion of the contract from $321,715.16 to $351,715.16 for the 412 Boulevard of the Allies office build-out. During the final phase of design, it was determined that there were layout changes needed by the user departments as well as structural drawings and calculations to be resolved before construction documents could be completed. These services were not included in the original Scope of Work and once added, will increase the overall contract by a not-to-exceed additional fee of $30,000.00.
body
WHEREAS, pursuant to Resolution 42 effective January 10, 2019, the City of Pittsburgh (the "City") was authorized to enter into a professional services agreement with AE7 Pittsburgh LLC for architectural and engineering design services for the multi-story office build-out at 412 Boulevard of the Allies, Pittsburgh, PA 15219 (the "Property"), for the not-to-exceed amount of $596,576.51, with specific amounts assigned to the City, Housing Authority of the City of Pittsburgh ("HACP") and shared areas; and
WHEREAS, since the Resolution was passed, City Council separately authorized the City to condominimize the Property into condominium units along with the Urban Redevelopment Authority of Pittsburgh and the HACP; and
WHEREAS, the proposed conversion to condominium units has required re-measurement of the space to reconfigure the appropriate ownership interests and a corresponding reallocation of the share of build-out funding; and
WHEREAS, the Resolution further acknowledged that if the allocations assigned to various unit owners needed to be adjusted, another resolution would be prepared to reconcile the changes.
Be it resolved by the Council of the City of Pittsburgh as follows:
Section 1.
Section 1 of Resolution 42 effective January 10, 2019 is hereby revised to r...
Click here for full text