Pittsburgh Logo
File #: 2021-1750    Version: 1
Type: Resolution Status: Passed Finally
File created: 8/20/2021 In control: Committee on Intergovernmental Affairs
On agenda: 8/24/2021 Final action: 8/31/2021
Enactment date: 8/31/2021 Enactment #: 505
Effective date: 9/1/2021    
Title: Resolution authorizing the Mayor and the Director of the Department of Mobility and Infrastructure to enter into a contribution and cooperation agreement with the Pittsburgh Water and Sewer Authority (PWSA) for work in connection with the Winchester Drive Project.
Indexes: COOPERATION AGREEMENT/S
Attachments: 1. 2021-1750 Cover Letter-Winchester Drive PWSA Co-Op Letter8_signed, 2. Summary 2021-1750

title

Resolution authorizing the Mayor and the Director of the Department of Mobility and Infrastructure to enter into a contribution and cooperation agreement with the Pittsburgh Water and Sewer Authority (PWSA) for work in connection with the Winchester Drive Project.

 

body

WHEREAS, the City and PWSA wish to implement road improvements and stormwater management improvements at Winchester Drive at the Grovemount Road intersection in the 20th Ward (Banksville Neighborhood), Sewershed MH-18; and

 

WHEREAS, PWSA is overseeing the design and construction of the stormwater management components (outlet structures, catch basins, and connections back into PWSA’s system) as well as roadway replacement and rehabilitation and has or will retain the services of a Design Consultant, Construction Management/Inspection Consultant, and Construction Contractor for the same; and

 

WHEREAS, the City will participate in the project and is willing to reimburse PWSA One Hundred and Sixty-Seven Thousand, Three Hundred, and Seventy-Four Dollars, and Fifty-Three Cents ($167,374.53)

 

 

Be it resolved by the Council of the City of Pittsburgh as follows:

 

Section 1.                     The Mayor and the Director of the Department of Mobility and Infrastructure are authorized to enter into a contribution and cooperation agreement with PWSA for work in connection with the Winchester Drive Project at a cost to the city not to exceed One Hundred and Sixty Seven Thousand Three Hundred and Seventy Four Dollars and Fifty Three Cents ($167,374.53) chargeable and payable from the following account/s:

 

 

JDE JOB NO.

FUND

BUDGET YEAR

Total Encumbrance

Source

6000900321

40021

2021

$167,374.53

Bond

Total

 

 

$167,374.53