Pittsburgh Logo
File #: 2021-1496    Version: 1
Type: Resolution Status: Passed Finally
File created: 5/14/2021 In control: Committee on Public Works
On agenda: 5/17/2021 Final action: 6/1/2021
Enactment date: 6/1/2021 Enactment #: 353
Effective date: 6/7/2021    
Title: Resolution authorizing the transfer by the City of Pittsburgh to the Commonwealth of Pennsylvania Department of Transportation ("PennDOT") certain temporary construction easement rights on certain property of the 4th Ward of the City of Pittsburgh in cooperation with a PennDOT construction project.
Indexes: COOPERATION AGREEMENT/S
Attachments: 1. 2021-1496 Cover Ltr Letter PennDOT, 2. 2021-1496 TCE Exhibit A, 3. Summary 2021-1496
title
Resolution authorizing the transfer by the City of Pittsburgh to the Commonwealth of Pennsylvania Department of Transportation ("PennDOT") certain temporary construction easement rights on certain property of the 4th Ward of the City of Pittsburgh in cooperation with a PennDOT construction project.

body
Be it resolved by the Council of the City of Pittsburgh as follows:

Section 1. The Mayor and the Director of the Department on Finance and the Director of the Department of Mobility and Infrastructure, on behalf of the City of Pittsburgh, are authorized to execute all relevant documents to transfer to PennDOT, in cooperation with a PennDOT construction project, certain temporary construction easement rights within certain properties in the 4th Ward of the City of Pittsburgh described and depicted in the plan attached as Exhibit A and as further described below:

All that certain parcel of land situated in City of Pittsburgh, County of Allegheny, Commonwealth of Pennsylvania, being bound and described according to the Pennsylvania Department of Transportation S.R. 0885 Section A46 R/W and S.R. 8004 Section A03 R/W plan to be recorded in the Allegheny County Department of Real Estate Office. A Temporary Construction Easement beginning at a point at the intersection of the easterly legal right-of-way line for Brady Street and the southerly legal right-of-way line for SR 8004 (Ramp T), said point being 47' ? right and opposite S.R. 8004 Ramp T survey and right-of-way baseline, station 4728+12 ?; thence continuing along the legal right-of-way line for SR 8004 (Ramp T) to a point on the legal right-of-way line for SR 8004 (Ramp T), said point being 37' ? right and opposite S.R. 8004 Ramp T survey and right-of-way baseline, station 4728+59 ?; thence continuing along the legal right-of-way line for SR 8004 (Ramp T) to a point on the legal right-of-way line for SR 8004 (Ramp T), said point being 18' ? right and opposite S.R. 8004 Ramp T survey and right-of-...

Click here for full text