Presenter
Presented by Ms. Carlisle
Title
Resolution accepting the dedication of certain streets in the South Side Works project in the 16th Ward of the City of Pittsburgh for public highway and pedestrian ramp purposes, accepting the grading, paving, lighting, curbing and traffic signals, and fixing the width and position of the roadway and sidewalk thereof. (Council District 3).
body
Whereas, Urban Redevelopment Authority of Pittsburgh, owner of certain property in the South Side Works project in the 16th Ward of the City of Pittsburgh, wishes to dedicate certain streets to the City of Pittsburgh for public highway and pedestrian ramp purposes and the City of Pittsburgh wishes to accept the dedication;
Be it resolved by the Council of the City of Pittsburgh as follows:
Section 1. The dedication of the following streets is hereby accepted:
(a) Hot Metal Street (also known as S. 29th Street, formerly known as Gateway Boulevard) from East Carson Street to Hot Metal Bridge.
All those certain lots or parcels of ground situate in the 16th Ward of the City of Pittsburgh designated as Parcel 4-Revised in South Side Works Plan of Lots No. 6, recorded in Plan Book Volume 220, pages 193 and 194, and Parcel 6a in South Side Works Plan of Lots No. 21, recorded in Plan Book Volume 249, page 178, bounded and described as follows:
First
Beginning at a point on the north side of East Carson Street, approximately 87 feet to the west of the center of existing South 29th Street, then continuing along the following bearings and distances:
Bearing/ Distances
1. N 41°05'43" E 762.97'
2. Radius = 960.00'; Arc = 197.78'
3. N 52°53'58" E 79.29'
4. N 40°05'44" W 80.00'
5. S 52°53'58" W 75.10'
6. Radius = 1040.00'; Arc = 214.26'
7. S 41°05'43" W 0.96'
8. S 48°37'51" E 10.00'
9. S 41°05'43" W 761.97'
10. S 48°55'22" E 70.00'
to the place of the beginning. Containing a total area of 76,075.42 Sq. Ft. or 1.746 Acres. The bear...